CLIENT
BFS S.M.S.A.
PROJECT YEAR
2023-2025
PROJECT LOCATION
M.S.S. MEGARA, OLYMPIA ODOS (2 sectors)
M.S.S. ZEVGOLATO, OLYMPIA ODOS (1 sector)
M.S.S. AKRATA, OLYMPIA ODOS (2 sectors)
M.S.S. AGIO, OLYMPIA ODOS (2 sectors)
M.S.S. ALMYROS, AEGEAN MOTORWAY (2 sectors)
M.S.S. SKOTINAS, AEGEAN MOTORWAY (2 sectors)
PROJECT INFORMATION
The project pertain the development and operation of an accessible public network of fast and ultra-fast charging stations for electric vehicles by HELLENIC FAST CHARGING SERVICES S.A. in M.S.S. of OLYMPIA ODOS and AEGEAN MOTORWAY.
In particular, these facilities include the following for each MSS sector
180kW DC electric charger, four (4) electric chargers
Electric charging parking spaces, two (2) parking spaces per electric charger, eight (8) parking spaces in total
One (1) M/V Substation (complete new installation), 800 kVA
In MSS Megara and Akrata, a ground floor building for the layout of the 20kV switchboard space from HEDNO
CONFIDE undertook all the required studies and permits for the connection of the recharging infrastructure of electric vehicles to the new Medium Voltage network and the constructions’ approvals from the Ministry of Infrastructure.
CONFIDE also undertook the construction of the electric charging facilities at the 4 locations of the M.S.S. Megara and Akrata.
STATUS PROJECT
ON PROGRESS