CLIENT

AEGEAN MOTORWAY S.A.


PROJECT YEAR

2014-2017


PROJECT LOCATION

336,6km on the National Road Athinon – Thessalonikis, AEGEAN MOTORWAY, Moschochori.


PROJECT INFORMATION

The Moschohori Operation and Maintenance Center of the Aegean Motorway extends over an area of ​​approximately 21,000m2, in which are located


  • Police Station Building of approximately 250m2,

  • Toll Management Building of approximately 360m2,

  • Salt Warehouse Building of approximately 250m2,

  • Highway Administration Building (H.A.B.) of approximately 1000 m2,

  • Administration Building of approximately 2300 m2,

  • Vehicle (truck) shelter of approximately 500m2,

  • Vehicle maintenance shed of approximately 400m2,

  • O.M.C. entrance guardhouse about 35m2,

  • Substation building M.V. & Generetor Pumping Stations of approx. 140m2,

  • Water tank approx. 35m2, Dirt Collection and Treatment Facility approx. 30m2.


CONFIDE undertook the conduction of the general layout Studies and the infrastructure of the Operation and Maintenance Center, as well as all the required Studies and Approvals for the construction of the Management Center and the Central Administration Building of the Motorway. CONFIDE supervised the whole construction.


STATUS PROJECT

IN OPERATION


PROJECT PHOTOS


 
 
CONFIDE
Πληροφορίες

Για οποιαδήποτε πληροφορία, ερώτηση ή ενημέρωση, απευθυνθείτε στο: 210-7294204 ή συμπληρώστε την παρακάτω φόρμα επικοινωνίας

Thanks for submitting!

Διεύθυνση

Δορυλαίου 10 - 12

Αθήνα, 11521

Tel: 210-7294204

Fax: 210-7254204

E-mail: info@confide.gr

Εργασία

Για να υποβάλετε αίτηση εργασίας στην Confide Ε.Π.Ε. μπορείτε να στείλετε το βιογραφικό σας στο email: info@confide.gr

©2025 by Confide L.T.D. Powered by Designature. Οικονομικά Στοιχεία.

bottom of page